Structure D-01-CC-160 · Denver County, CO

11th AVE over Cherry Creek

Carries 11th AVE over Cherry Creek, W 11th AVE At Speer BLVD.

Overall conditionFair

Set by its lowest-rated component: Deck and Superstructure and Substructure at 5 of 9.

How ratings work
Decksets the rating5/9 · Fair
Superstructuresets the rating5/9 · Fair
Substructuresets the rating5/9 · Fair
Channelnot part of overall5/9 · Fair
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
CAR · 15 FT88 FT OVERALL25 FT0ELEVATION · LENGTHS TO SCALE
Deck 5/9Superstructure 5/9Substructure 5/9

88 ft end to end, longest span 40 ft. Lengths and the car on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a slab bridge.

Built1925rebuilt 1984
Length87.9 ft26.8 m
Daily traffic6,301counted 2021
Last inspectedOctober 2024every 24 months

Location

StateColorado
CountyDenver
LocationW 11th AVE At Speer BLVD
Carries11th AVE
CrossesCherry Creek
Coordinates39.73358, -104.99394

Physical Characteristics

MaterialConcrete Continuous
DesignSlab
Total Length87.9 ft (26.8 m)
Max Span39.7 ft (12.1 m)
Deck Width63.3 ft (19.3 m)
Deck Area517.2 sq m
Main Spans2
Year Built1925 (reconstructed 1984)

Traffic

Avg Daily Traffic6,301 (2021)
Truck Traffic4%
Lanes On Bridge4

Inspection & Ownership

Last InspectionOctober 2024
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is eligible for the National Register
Scour Critical8 — Stable, low risk
Structure NumberD-01-CC-160

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.