Structure GREELEY-0000009 · Weld County, CO
Carries 4th Street over Greeley No. 3 Ditch, 0.64 Mi E Of 35th AVE.
A culvert 21 ft across. Lengths are drawn to scale; at this length a semi-truck would be a speck. Each part is colored by its latest inspection rating. The inventory records lengths but not heights, so those are drawn as typical for a culvert.
| State | Colorado |
| County | Weld |
| Location | 0.64 Mi E Of 35th AVE |
| Carries | 4th Street |
| Crosses | Greeley No. 3 Ditch |
| Coordinates | 40.43023, -104.72293 |
| Material | Concrete |
| Design | Culvert |
| Total Length | 21.0 ft (6.4 m) |
| Max Span | 21.0 ft (6.4 m) |
| Deck Width | 59.1 ft (18 m) |
| Deck Area | 115.2 sq m |
| Main Spans | 1 |
| Year Built | 1972 |
| Avg Daily Traffic | 16,883 (2023) |
| Truck Traffic | 13% |
| Lanes On Bridge | 2 |
| Last Inspection | April 2024 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Scour Critical | 8 — Stable, low risk |
| Structure Number | GREELEY-0000009 |
Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."
A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.