Structure 81015600000000 · Rock Island County, IL

52nd AVE over Milan Beltway

Carries 52nd AVE over Milan Beltway, .04mi S John Deer RD.

Overall conditionGood

Set by its lowest-rated component: Deck and Superstructure and Substructure at 7 of 9.

How ratings work
Decksets the rating7/9 · Good
Superstructuresets the rating7/9 · Good
Substructuresets the rating7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT201 FT OVERALL25 FT0ELEVATION · LENGTHS TO SCALE
Deck 7/9Superstructure 7/9Substructure 7/9

201 ft end to end, longest span 91 ft: about 3 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built200620 years old
Length201.4 ft61.4 m
Daily traffic12,100counted 2020
Last inspectedOctober 2024every 48 months

Location

StateIllinois
CountyRock Island
Location.04mi S John Deer RD
Carries52nd AVE
CrossesMilan Beltway
Coordinates41.46804, -90.53626

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length201.4 ft (61.4 m)
Max Span90.9 ft (27.7 m)
Deck Width73.2 ft (22.3 m)
Deck Area1369.2 sq m
Main Spans2
Year Built2006

Traffic

Avg Daily Traffic12,100 (2020)
Truck Traffic4%
Lanes On Bridge4
Lanes Under Bridge4

Inspection & Ownership

Last InspectionOctober 2024
Inspection FrequencyEvery 48 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour CriticalNot applicable
Structure Number081015600000000

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.