Structure 9594 · Jefferson County, AL

Al - 3 North over 7th AVE South

Carries Al - 3 North over 7th AVE South, US 31 * 7 TH AVE So.

Overall conditionFair

Set by its lowest-rated component: Deck and Superstructure at 5 of 9.

How ratings work
Decksets the rating5/9 · Fair
Superstructuresets the rating5/9 · Fair
Substructure6/9 · Satisfactory
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT211 FT OVERALL25 FT0ELEVATION · LENGTHS TO SCALE
Deck 5/9 · sets the ratingSuperstructure 5/9 · sets the ratingSubstructure 6/9

211 ft end to end, longest span 80 ft: about 3 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a tee-beam bridge.

Built196858 years old
Length211.0 ft64.3 m
Daily traffic36,335counted 2024
Last inspectedNovember 2024every 24 months

Location

StateAlabama
CountyJefferson
LocationUS 31 * 7 TH AVE So
CarriesAl - 3 North
Crosses7th AVE South
Coordinates33.50972, -86.79139

Physical Characteristics

MaterialConcrete Continuous
DesignTee Beam
Total Length211.0 ft (64.3 m)
Max Span80.1 ft (24.4 m)
Deck Width55.1 ft (16.8 m)
Deck Area1080.2 sq m
Main Spans3
Year Built1968

Traffic

Avg Daily Traffic36,335 (2024)
Truck Traffic3%
Lanes On Bridge3
Lanes Under Bridge2

Inspection & Ownership

Last InspectionNovember 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour CriticalNot applicable
Structure Number009594

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.