Structure 9800850011700 · Sullivan County, NH

Brook Road over Gunnison Brook

Carries Brook Road over Gunnison Brook, .05 Mi NE Of Jct Nh 10.

Overall conditionFair

Set by its lowest-rated component: Deck and Superstructure at 6 of 9.

How ratings work
Decksets the rating6/9 · Satisfactory
Superstructuresets the rating6/9 · Satisfactory
Substructure7/9 · Good
Channelnot part of overall7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
CAR · 15 FT29 FT OVERALL25 FT0ELEVATION · LENGTHS TO SCALE
Deck 6/9 · sets the ratingSuperstructure 6/9 · sets the ratingSubstructure 7/9

29 ft end to end. Lengths and the car on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a slab bridge.

Built1940rebuilt 1998
Length29.2 ft8.9 m
Daily traffic1,012counted 2023
Last inspectedMarch 2024every 24 months

Location

StateNew Hampshire
CountySullivan
Location.05 Mi NE Of Jct Nh 10
CarriesBrook Road
CrossesGunnison Brook
Coordinates43.30136, -72.14761

Physical Characteristics

MaterialConcrete
DesignSlab
Total Length29.2 ft (8.9 m)
Max Span26.9 ft (8.2 m)
Deck Width32.2 ft (9.8 m)
Deck Area87.2 sq m
Main Spans1
Year Built1940 (reconstructed 1998)

Traffic

Avg Daily Traffic1,012 (2023)
Truck Traffic10%
Lanes On Bridge2

Inspection & Ownership

Last InspectionMarch 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is possibly eligible (requires evaluation)
Scour Critical8 — Stable, low risk
Structure Number009800850011700

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.