Structure 56C0443 · Riverside County, CA

Butterfield Stage over Temecula Creek

Carries Butterfield Stage over Temecula Creek, 0.2 Mi. S/o Route 79 Hwy..

Overall conditionGood

Set by its lowest-rated component: Deck and Superstructure and Substructure at 7 of 9.

How ratings work
Decksets the rating7/9 · Good
Superstructuresets the rating7/9 · Good
Substructuresets the rating7/9 · Good
Channelnot part of overall8/9 · Very Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT457 FT OVERALL100 FT0ELEVATION · LENGTHS TO SCALE
Deck 7/9Superstructure 7/9Substructure 7/9

457 ft end to end, longest span 70 ft: about 6 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a slab bridge.

Built199333 years old
Length457.0 ft139.3 m
Daily traffic5,000counted 2014
Last inspectedDecember 2023every 48 months

Location

StateCalifornia
CountyRiverside
Location0.2 Mi. S/o Route 79 Hwy.
CarriesButterfield Stage
CrossesTemecula Creek
Coordinates33.48291, -117.07658

Physical Characteristics

MaterialConcrete Continuous
DesignSlab
Total Length457.0 ft (139.3 m)
Max Span69.9 ft (21.3 m)
Deck Width93.8 ft (28.6 m)
Deck Area3984.0 sq m
Main Spans7
Year Built1993

Traffic

Avg Daily Traffic5,000 (2014)
Truck Traffic1%
Lanes On Bridge4

Inspection & Ownership

Last InspectionDecember 2023
Inspection FrequencyEvery 48 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical8 — Stable, low risk
Structure Number56C0443

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.