Overall conditionFair

Set by its lowest-rated component: Substructure at 5 of 9.

How ratings work
Deck8/9 · Very Good
Superstructure7/9 · Good
Substructuresets the rating5/9 · Fair
Channelnot part of overall5/9 · Fair
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT232 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 8/9Superstructure 7/9Substructure 5/9 · sets the rating

232 ft end to end, longest span 109 ft: about 3 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built198442 years old
Length231.6 ft70.6 m
Daily traffic4,267counted 2022
Last inspectedSeptember 2023every 24 months

Location

StateColorado
CountyDelta
LocationW Entrance To Paonia
CarriesCounty Road O.90
CrossesNorth Fork Gunnison Rvr
Coordinates38.86914, -107.60372

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignStringer/Multi-beam
Total Length231.6 ft (70.6 m)
Max Span108.9 ft (33.2 m)
Deck Width29.9 ft (9.1 m)
Deck Area642.5 sq m
Main Spans2
Year Built1984

Traffic

Avg Daily Traffic4,267 (2022)
Truck Traffic2%
Lanes On Bridge2

Inspection & Ownership

Last InspectionSeptember 2023
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical5 — Stable for scour
Structure NumberDELO.90-41.3-66

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.

Nearby Bridges