Structure B54001800000000 · Rusk County, WI

Cth D over Chippewa River 20

Carries Cth D over Chippewa River 20, 2.0m E Jct Cth E.

Overall conditionFair

Set by its lowest-rated component: Deck and Substructure at 6 of 9.

How ratings work
Decksets the rating6/9 · Satisfactory
Superstructure7/9 · Good
Substructuresets the rating6/9 · Satisfactory
Channelnot part of overall8/9 · Very Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT719 FT OVERALL100 FT0ELEVATION · LENGTHS TO SCALE
Deck 6/9 · sets the ratingSuperstructure 7/9Substructure 6/9 · sets the rating

719 ft end to end, longest span 128 ft: about 2.0 football fields. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built197254 years old
Length719.2 ft219.2 m
Daily traffic680counted 2021
Last inspectedMay 2024every 24 months

Location

StateWisconsin
CountyRusk
Location2.0m E Jct Cth E
CarriesCth D
CrossesChippewa River 20
Coordinates45.30255, -91.19966

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length719.2 ft (219.2 m)
Max Span128.0 ft (39 m)
Deck Width33.8 ft (10.3 m)
Deck Area2257.8 sq m
Main Spans6
Year Built1972

Traffic

Avg Daily Traffic680 (2021)
Lanes On Bridge2

Inspection & Ownership

Last InspectionMay 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical8 — Stable, low risk
Structure NumberB54001800000000

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.