Structure 53C0792 · Los Angeles County, CA

Del Amo BLVD over Coyote CR

Carries Del Amo BLVD over Coyote CR, 0.8mi E/o Bloomfield AVE.

Overall conditionFair

Set by its lowest-rated component: Deck and Superstructure at 5 of 9.

How ratings work
Decksets the rating5/9 · Fair
Superstructuresets the rating5/9 · Fair
Substructure7/9 · Good
Channelnot part of overall9/9 · Excellent
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT265 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 5/9 · sets the ratingSuperstructure 5/9 · sets the ratingSubstructure 7/9

265 ft end to end, longest span 87 ft: about 4 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built196561 years old
Length265.1 ft80.8 m
Daily traffic20,793counted 2018
Last inspectedJune 2024every 24 months

Location

StateCalifornia
CountyLos Angeles
Location0.8mi E/o Bloomfield AVE
CarriesDel Amo BLVD
CrossesCoyote CR
Coordinates33.84634, -118.05867

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length265.1 ft (80.8 m)
Max Span86.9 ft (26.5 m)
Deck Width36.7 ft (11.2 m)
Deck Area905.0 sq m
Main Spans3
Year Built1965

Traffic

Avg Daily Traffic20,793 (2018)
Truck Traffic1%
Lanes On Bridge2

Inspection & Ownership

Last InspectionJune 2024
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical8 — Stable, low risk
Structure Number53C0792

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.

Nearby Bridges