E Morrison RD over Ccdd # 1 Ditch No. 1
Fair Condition14 years old15,268 vehicles/day
Location
| State | Texas |
| County | Cameron |
| Location | 1.25 Mi E Of US 77 |
| Carries | E Morrison RD |
| Crosses | Ccdd # 1 Ditch No. 1 |
| Coordinates | 25.97357, -97.49705 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 7 (Good) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 71.9 ft (21.9 m) |
| Max Span | 9.8 ft (3 m) |
| Deck Area | 427.1 sq m |
| Main Spans | 3 |
| Year Built | 2012 |
Traffic
| Avg Daily Traffic | 15,268 (2022) |
| Truck Traffic | 4% |
| Lanes On Bridge | 5 |
Inspection & Ownership
| Last Inspection | 324 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 210310C03065001 |