Structure 750750 · Orange County, FL

EB Sr-408 To I4 WB over Division Avenue

Carries EB Sr-408 To I4 WB over Division Avenue, 1.7mi E/o Us-17.

Overall conditionGood

Set by its lowest-rated component: Deck and Superstructure and Substructure at 8 of 9.

How ratings work
Decksets the rating8/9 · Very Good
Superstructuresets the rating8/9 · Very Good
Substructuresets the rating8/9 · Very Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT647 FT OVERALL100 FT0ELEVATION · LENGTHS TO SCALE
Deck 8/9Superstructure 8/9Substructure 8/9

647 ft end to end, longest span 192 ft: about 1.8 football fields. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a box-beam bridge.

Built20206 years old
Length647.0 ft197.2 m
Daily traffic22,500counted 2020
Last inspectedApril 2024every 24 months

Location

StateFlorida
CountyOrange
Location1.7mi E/o Us-17
CarriesEB Sr-408 To I4 WB
CrossesDivision Avenue
Coordinates28.53442, -81.38500

Physical Characteristics

MaterialSteel Continuous
DesignBox Beam - Single/Spread
Total Length647.0 ft (197.2 m)
Max Span191.9 ft (58.5 m)
Deck Width35.4 ft (10.8 m)
Deck Area2129.8 sq m
Main Spans4
Year Built2020

Traffic

Avg Daily Traffic22,500 (2020)
Lanes On Bridge1
Lanes Under Bridge6

Inspection & Ownership

Last InspectionApril 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour CriticalNot applicable
Structure Number750750

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.

Nearby Bridges