Structure 29321300000000 · Fulton County, IL

Fas 452-ch 2 over Putt Creek

Carries Fas 452-ch 2 over Putt Creek, Sw-4-t6nr2e.

Overall conditionFair

Set by its lowest-rated component: Deck at 5 of 9.

How ratings work
Decksets the rating5/9 · Fair
Superstructure7/9 · Good
Substructure6/9 · Satisfactory
Channelnot part of overall7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT302 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 5/9 · sets the ratingSuperstructure 7/9Substructure 6/9

302 ft end to end, longest span 60 ft: about 4 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a box-beam bridge.

Built200620 years old
Length302.2 ft92.1 m
Daily traffic375counted 2020
Last inspectedOctober 2024every 24 months

Location

StateIllinois
CountyFulton
LocationSw-4-t6nr2e
CarriesFas 452-ch 2
CrossesPutt Creek
Coordinates40.52690, -90.29103

Physical Characteristics

MaterialPrestressed Concrete
DesignBox Beam - Multiple
Total Length302.2 ft (92.1 m)
Max Span60.0 ft (18.3 m)
Deck Width27.9 ft (8.5 m)
Deck Area782.9 sq m
Main Spans5
Year Built2006

Traffic

Avg Daily Traffic375 (2020)
Truck Traffic40%
Lanes On Bridge2

Inspection & Ownership

Last InspectionOctober 2024
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical5 — Stable for scour
Structure Number029321300000000

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.

Nearby Bridges