Structure 53C0618 · Los Angeles County, CA
Carries Fort Tejon RD over Unnamed Wash, 2.0mi W/o Pallet Crk RD.
Set by its lowest-rated component: Deck and Superstructure at 7 of 9.
How ratings work23 ft end to end. Lengths are drawn to scale; at this length a semi-truck would be a speck. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a slab bridge.
| State | California |
| County | Los Angeles |
| Location | 2.0mi W/o Pallet Crk RD |
| Carries | Fort Tejon RD |
| Crosses | Unnamed Wash |
| Coordinates | 34.47241, -117.89952 |
| Material | Wood or Timber |
| Design | Slab |
| Total Length | 23.0 ft (7 m) |
| Max Span | 21.0 ft (6.4 m) |
| Deck Width | 31.2 ft (9.5 m) |
| Deck Area | 66.5 sq m |
| Main Spans | 1 |
| Year Built | 1953 |
| Avg Daily Traffic | 918 (2017) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
| Last Inspection | July 2024 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Scour Critical | 8 — Stable, low risk |
| Structure Number | 53C0618 |
Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."
A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.