Structure 7760019 · Summit County, OH

High-main Viaduct over Garage Dr-goodrich (150)

Carries High-main Viaduct over Garage Dr-goodrich (150), W. Of Bf Goodrich Bldg..

Overall conditionFair

Set by its lowest-rated component: Substructure at 6 of 9.

How ratings work
Deck8/9 · Very Good
Superstructure7/9 · Good
Substructuresets the rating6/9 · Satisfactory
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT982 FT OVERALL200 FT0ELEVATION · LENGTHS TO SCALE
Deck 8/9Superstructure 7/9Substructure 6/9 · sets the rating

982 ft end to end, longest span 116 ft: about 2.7 football fields. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built1971rebuilt 2005
Length982.0 ft299.3 m
Daily traffic12,506counted 2015
Last inspectedOctober 2024every 12 months

Location

StateOhio
CountySummit
LocationW. Of Bf Goodrich Bldg.
CarriesHigh-main Viaduct
CrossesGarage Dr-goodrich (150)
Coordinates41.07248, -81.52350

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length982.0 ft (299.3 m)
Max Span116.1 ft (35.4 m)
Deck Width47.9 ft (14.6 m)
Deck Area4369.8 sq m
Main Spans13
Year Built1971 (reconstructed 2005)

Traffic

Avg Daily Traffic12,506 (2015)
Truck Traffic7%
Lanes On Bridge3

Inspection & Ownership

Last InspectionOctober 2024
Inspection FrequencyEvery 12 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour CriticalNot applicable
Structure Number7760019

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.

Nearby Bridges