Structure 11931 · Mobile County, AL

I-10 EB over Mobile Bay * US 90

Carries I-10 EB over Mobile Bay * US 90, East Tunnel Interchange.

Overall conditionFair

Set by its lowest-rated component: Deck and Superstructure and Substructure at 5 of 9.

How ratings work
Decksets the rating5/9 · Fair
Superstructuresets the rating5/9 · Fair
Substructuresets the rating5/9 · Fair
Channelnot part of overall6/9 · Satisfactory
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
39,728 FT OVERALL1 MILE0ELEVATION · LENGTHS TO SCALE
Deck 5/9Superstructure 5/9Substructure 5/9

39,728 ft end to end, longest span 154 ft: about 110 football fields, or 7.5 miles. Lengths are drawn to scale; at this length a semi-truck would be a speck. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built197848 years old
Length39728.0 ft12109.1 m
Daily traffic32,384counted 2022
Last inspectedAugust 2023every 24 months

Location

StateAlabama
CountyMobile
LocationEast Tunnel Interchange
CarriesI-10 EB
CrossesMobile Bay * US 90
Coordinates30.69185, -88.02888

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length39728.0 ft (12109.1 m)
Max Span153.9 ft (46.9 m)
Deck Width42.0 ft (12.8 m)
Deck Area154996.5 sq m
Main Spans2
Year Built1978

Traffic

Avg Daily Traffic32,384 (2022)
Truck Traffic15%
Lanes On Bridge2
Lanes Under Bridge30

Inspection & Ownership

Last InspectionAugust 2023
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical8 — Stable, low risk
Structure Number011931

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.

Nearby Bridges