Structure C 401 · Salt Lake County, UT

I-15Ramp To Sr-270 over 300 West Street & Up

Carries I-15Ramp To Sr-270 over 300 West Street & Up, 1000 So.300 West-slc..

Overall conditionFair

Set by its lowest-rated component: Superstructure and Substructure at 6 of 9.

How ratings work
Deck7/9 · Good
Superstructuresets the rating6/9 · Satisfactory
Substructuresets the rating6/9 · Satisfactory
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT346 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 7/9Superstructure 6/9 · sets the ratingSubstructure 6/9 · sets the rating

346 ft end to end, longest span 99 ft: about 5 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built1967rebuilt 2017
Length346.1 ft105.5 m
Daily traffic11,490counted 2012
Last inspectedJuly 2024every 24 months

Location

StateUtah
CountySalt Lake
Location1000 So.300 West-slc.
CarriesI-15Ramp To Sr-270
Crosses300 West Street & Up
Coordinates40.74750, -111.90073

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length346.1 ft (105.5 m)
Max Span99.1 ft (30.2 m)
Deck Width66.6 ft (20.3 m)
Deck Area2141.7 sq m
Main Spans5
Year Built1967 (reconstructed 2017)

Traffic

Avg Daily Traffic11,490 (2012)
Truck Traffic25%
Lanes On Bridge4
Lanes Under Bridge4

Inspection & Ownership

Last InspectionJuly 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour CriticalNot applicable
Structure Number0C 401

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.