Structure 870312 · Miami-Dade County, FL

I-195 over North Miami AVE

Carries I-195 over North Miami AVE, I-195 & N Miami AVE.

Overall conditionFair

Set by its lowest-rated component: Deck and Superstructure at 6 of 9.

How ratings work
Decksets the rating6/9 · Satisfactory
Superstructuresets the rating6/9 · Satisfactory
Substructure7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT161 FT OVERALL25 FT0ELEVATION · LENGTHS TO SCALE
Deck 6/9 · sets the ratingSuperstructure 6/9 · sets the ratingSubstructure 7/9

161 ft end to end, longest span 76 ft: about 2 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built1960rebuilt 2012
Length161.1 ft49.1 m
Daily traffic147,500counted 2024
Last inspectedJuly 2024every 24 months

Location

StateFlorida
CountyMiami-Dade
LocationI-195 & N Miami AVE
CarriesI-195
CrossesNorth Miami AVE
Coordinates25.81151, -80.19537

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length161.1 ft (49.1 m)
Max Span76.4 ft (23.3 m)
Deck Width104.3 ft (31.8 m)
Deck Area1561.4 sq m
Main Spans3
Year Built1960 (reconstructed 2012)

Traffic

Avg Daily Traffic147,500 (2024)
Truck Traffic5%
Lanes On Bridge6
Lanes Under Bridge5

Inspection & Ownership

Last InspectionJuly 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour CriticalNot applicable
Structure Number870312

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.

Nearby Bridges