Structure P-18-CF · Las Animas County, CO

I 25 Sbnd Offramp over Purgatoire River

Carries I 25 Sbnd Offramp over Purgatoire River, In Trinidad.

Overall conditionGood

Set by its lowest-rated component: Deck and Superstructure at 7 of 9.

How ratings work
Decksets the rating7/9 · Good
Superstructuresets the rating7/9 · Good
Substructure8/9 · Very Good
Channelnot part of overall8/9 · Very Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT355 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 7/9 · sets the ratingSuperstructure 7/9 · sets the ratingSubstructure 8/9

355 ft end to end, longest span 130 ft: about 5 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a box-beam bridge.

Built201016 years old
Length354.7 ft108.1 m
Daily traffic8,000counted 2020
Last inspectedOctober 2024every 24 months

Location

StateColorado
CountyLas Animas
LocationIn Trinidad
CarriesI 25 Sbnd Offramp
CrossesPurgatoire River
Coordinates37.16711, -104.51196

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignBox Beam - Single/Spread
Total Length354.7 ft (108.1 m)
Max Span130.2 ft (39.7 m)
Deck Width29.9 ft (9.1 m)
Deck Area983.7 sq m
Main Spans3
Year Built2010

Traffic

Avg Daily Traffic8,000 (2020)
Truck Traffic13%
Lanes On Bridge1

Inspection & Ownership

Last InspectionOctober 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical8 — Stable, low risk
Structure NumberP-18-CF

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.