Structure 150121 · Pinellas County, FL
Carries I-275 SB (sr-93) over 5th AVE N&s (sr-595), At Sr-595 (5th AVE N).
4,360 ft end to end, longest span 113 ft: about 12 football fields. Lengths are drawn to scale; at this length a semi-truck would be a speck. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.
| State | Florida |
| County | Pinellas |
| Location | At Sr-595 (5th AVE N) |
| Carries | I-275 SB (sr-93) |
| Crosses | 5th AVE N&s (sr-595) |
| Coordinates | 27.77108, -82.65830 |
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 4360.2 ft (1,329 m) |
| Max Span | 112.5 ft (34.3 m) |
| Deck Width | 48.2 ft (14.7 m) |
| Deck Area | 19536.3 sq m |
| Main Spans | 45 |
| Year Built | 1980 |
| Avg Daily Traffic | 54,750 (2024) |
| Truck Traffic | 6% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 30 |
| Last Inspection | May 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Scour Critical | Not applicable |
| Structure Number | 150121 |
Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."
A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.