Structure F-08-BJ · Garfield County, CO

I 70 Ml Wbnd over Hillside

Carries I 70 Ml Wbnd over Hillside, .1 Mi E Of Hanging Lake T.

Overall conditionFair

Set by its lowest-rated component: Deck and Superstructure and Substructure at 6 of 9.

How ratings work
Decksets the rating6/9 · Satisfactory
Superstructuresets the rating6/9 · Satisfactory
Substructuresets the rating6/9 · Satisfactory
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
7,169 FT OVERALL1,000 FT0ELEVATION · LENGTHS TO SCALE
Deck 6/9Superstructure 6/9Substructure 6/9

7,169 ft end to end, longest span 208 ft: about 20 football fields, or 1.4 miles. Lengths are drawn to scale; at this length a semi-truck would be a speck. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a segmental box-girder bridge.

Built199333 years old
Length7169.0 ft2185.1 m
Daily traffic8,500counted 2020
Last inspectedMay 2024every 24 months

Location

StateColorado
CountyGarfield
Location.1 Mi E Of Hanging Lake T
CarriesI 70 Ml Wbnd
CrossesHillside
Coordinates39.59214, -107.17922

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignSegmental Box Girder
Total Length7169.0 ft (2185.1 m)
Max Span208.0 ft (63.4 m)
Deck Width35.4 ft (10.8 m)
Deck Area23599.1 sq m
Main Spans33
Year Built1993

Traffic

Avg Daily Traffic8,500 (2020)
Truck Traffic13%
Lanes On Bridge2

Inspection & Ownership

Last InspectionMay 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical9 — Foundation above flood level
Structure NumberF-08-BJ

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.