Structure 6753200 · Cobb County, GA
Carries I-75 Managed Lanes over SR 5-canton Rd-ga NE Rr, In North Marietta.
Set by its lowest-rated component: Deck and Superstructure and Substructure at 7 of 9.
How ratings work5,859 ft end to end, longest span 142 ft: about 16 football fields, or 1.1 miles. Lengths are drawn to scale; at this length a semi-truck would be a speck. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.
| State | Georgia |
| County | Cobb |
| Location | In North Marietta |
| Carries | I-75 Managed Lanes |
| Crosses | SR 5-canton Rd-ga NE Rr |
| Coordinates | 33.98136, -84.53990 |
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 5858.9 ft (1785.8 m) |
| Max Span | 142.1 ft (43.3 m) |
| Deck Width | 39.0 ft (11.9 m) |
| Deck Area | 21251.0 sq m |
| Main Spans | 45 |
| Year Built | 2016 |
| Avg Daily Traffic | 9,999 (2024) |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 8 |
| Last Inspection | February 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Scour Critical | Not applicable |
| Structure Number | 000000006753200 |
Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."
A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.