Structure 15751140 · Jackson County, GA

I-85 N/b And S/b over Middle Oconee River

Carries I-85 N/b And S/b over Middle Oconee River, 1.9m SE Of Pendergrass.

Overall conditionGood

Set by its lowest-rated component: Deck and Substructure at 7 of 9.

How ratings work
Decksets the rating7/9 · Good
Superstructure8/9 · Very Good
Substructuresets the rating7/9 · Good
Channelnot part of overall8/9 · Very Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT311 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 7/9 · sets the ratingSuperstructure 8/9Substructure 7/9 · sets the rating

311 ft end to end, longest span 118 ft: about 4 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built20224 years old
Length311.0 ft94.8 m
Daily traffic61,700counted 2024
Last inspectedOctober 2024every 24 months

Location

StateGeorgia
CountyJackson
Location1.9m SE Of Pendergrass
CarriesI-85 N/b And S/b
CrossesMiddle Oconee River
Coordinates34.14838, -83.65124

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length311.0 ft (94.8 m)
Max Span118.1 ft (36 m)
Deck Width139.1 ft (42.4 m)
Deck Area4019.5 sq m
Main Spans3
Year Built2022

Traffic

Avg Daily Traffic61,700 (2024)
Truck Traffic22%
Lanes On Bridge6

Inspection & Ownership

Last InspectionOctober 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical5 — Stable for scour
Structure Number000000015751140

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.