Structure C130184HXDOTNBI · Hampden County, MA

I 90 WB over ST 33 Memorial DR

Carries I 90 WB over ST 33 Memorial DR, Mm 49.2 On I-90 WB.

Overall conditionFair

Set by its lowest-rated component: Deck and Superstructure and Substructure at 6 of 9.

How ratings work
Decksets the rating6/9 · Satisfactory
Superstructuresets the rating6/9 · Satisfactory
Substructuresets the rating6/9 · Satisfactory
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT166 FT OVERALL25 FT0ELEVATION · LENGTHS TO SCALE
Deck 6/9Superstructure 6/9Substructure 6/9

166 ft end to end, longest span 51 ft: about 2 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built1957rebuilt 1992
Length166.0 ft50.6 m
Daily traffic25,031counted 2017
Last inspectedFebruary 2025every 24 months

Location

StateMassachusetts
CountyHampden
LocationMm 49.2 On I-90 WB
CarriesI 90 WB
CrossesST 33 Memorial DR
Coordinates42.16970, -72.57779

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length166.0 ft (50.6 m)
Max Span51.2 ft (15.6 m)
Deck Width57.1 ft (17.4 m)
Deck Area880.4 sq m
Main Spans4
Year Built1957 (reconstructed 1992)

Traffic

Avg Daily Traffic25,031 (2017)
Truck Traffic12%
Lanes On Bridge2
Lanes Under Bridge4

Inspection & Ownership

Last InspectionFebruary 2025
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour CriticalNot applicable
Structure NumberC130184HXDOTNBI

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.