Structure 25402470008000 · Grafton County, NH

I-93 NB over Pemigewasset River

Carries I-93 NB over Pemigewasset River, 0.1 Mi Campton Tl.

Overall conditionGood

Set by its lowest-rated component: Deck and Superstructure and Substructure at 7 of 9.

How ratings work
Decksets the rating7/9 · Good
Superstructuresets the rating7/9 · Good
Substructuresets the rating7/9 · Good
Channelnot part of overall6/9 · Satisfactory
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT409 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 7/9Superstructure 7/9Substructure 7/9

409 ft end to end, longest span 155 ft: about 6 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built1969rebuilt 2002
Length409.1 ft124.7 m
Daily traffic7,498counted 2023
Last inspectedJuly 2023every 24 months

Location

StateNew Hampshire
CountyGrafton
Location0.1 Mi Campton Tl
CarriesI-93 NB
CrossesPemigewasset River
Coordinates43.86775, -71.66441

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length409.1 ft (124.7 m)
Max Span154.9 ft (47.2 m)
Deck Width44.3 ft (13.5 m)
Deck Area1683.5 sq m
Main Spans3
Year Built1969 (reconstructed 2002)

Traffic

Avg Daily Traffic7,498 (2023)
Truck Traffic10%
Lanes On Bridge2

Inspection & Ownership

Last InspectionJuly 2023
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical8 — Stable, low risk
Structure Number025402470008000

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.