Structure 16101850013100 · Hillsborough County, NH

I-93 SB over Bodwell Road

Carries I-93 SB over Bodwell Road, 3.2 Mi S.w Jct RT 28.

Overall conditionGood

Set by its lowest-rated component: Deck and Superstructure and Substructure at 7 of 9.

How ratings work
Decksets the rating7/9 · Good
Superstructuresets the rating7/9 · Good
Substructuresets the rating7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT163 FT OVERALL25 FT0ELEVATION · LENGTHS TO SCALE
Deck 7/9Superstructure 7/9Substructure 7/9

163 ft end to end, longest span 60 ft: about 2 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built1962rebuilt 2021
Length163.1 ft49.7 m
Daily traffic40,868counted 2023
Last inspectedApril 2023every 24 months

Location

StateNew Hampshire
CountyHillsborough
Location3.2 Mi S.w Jct RT 28
CarriesI-93 SB
CrossesBodwell Road
Coordinates42.95439, -71.40373

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length163.1 ft (49.7 m)
Max Span60.0 ft (18.3 m)
Deck Width89.9 ft (27.4 m)
Deck Area1361.8 sq m
Main Spans3
Year Built1962 (reconstructed 2021)

Traffic

Avg Daily Traffic40,868 (2023)
Truck Traffic6%
Lanes On Bridge5
Lanes Under Bridge2

Inspection & Ownership

Last InspectionApril 2023
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour CriticalNot applicable
Structure Number016101850013100

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.