Structure 11145 · Wayne County, MI

I-94 EB Ramp over Pelham RD

Carries I-94 EB Ramp over Pelham RD, In Taylor & Allen Park.

Overall conditionFair

Set by its lowest-rated component: Deck at 6 of 9.

How ratings work
Decksets the rating6/9 · Satisfactory
Superstructure7/9 · Good
Substructure7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT125 FT OVERALL25 FT0ELEVATION · LENGTHS TO SCALE
Deck 6/9 · sets the ratingSuperstructure 7/9Substructure 7/9

125 ft end to end. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built198145 years old
Length125.3 ft38.2 m
Daily traffic2,500counted 1988
Last inspectedNovember 2024every 24 months

Location

StateMichigan
CountyWayne
LocationIn Taylor & Allen Park
CarriesI-94 EB Ramp
CrossesPelham RD
Coordinates42.26594, -83.23169

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length125.3 ft (38.2 m)
Max Span121.7 ft (37.1 m)
Deck Width47.9 ft (14.6 m)
Deck Area557.7 sq m
Main Spans1
Year Built1981

Traffic

Avg Daily Traffic2,500 (1988)
Truck Traffic3%
Lanes On Bridge2
Lanes Under Bridge5

Inspection & Ownership

Last InspectionNovember 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour CriticalNot applicable
Structure Number000000000011145

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.

Nearby Bridges