Structure 7705557 · Summit County, OH

I.r. 76 over Csx Transportation

Carries I.r. 76 over Csx Transportation, 0.28 Mi E Of SR 619.

Overall conditionFair

Set by its lowest-rated component: Deck and Superstructure at 6 of 9.

How ratings work
Decksets the rating6/9 · Satisfactory
Superstructuresets the rating6/9 · Satisfactory
Substructure7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT379 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 6/9 · sets the ratingSuperstructure 6/9 · sets the ratingSubstructure 7/9

379 ft end to end, longest span 147 ft: about 5 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built1963rebuilt 1996
Length378.9 ft115.5 m
Daily traffic77,133counted 2015
Last inspectedNovember 2024every 12 months

Location

StateOhio
CountySummit
Location0.28 Mi E Of SR 619
CarriesI.r. 76
CrossesCsx Transportation
Coordinates41.03564, -81.57622

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length378.9 ft (115.5 m)
Max Span147.0 ft (44.8 m)
Deck Width111.9 ft (34.1 m)
Deck Area3938.6 sq m
Main Spans3
Year Built1963 (reconstructed 1996)

Traffic

Avg Daily Traffic77,133 (2015)
Truck Traffic20%
Lanes On Bridge6

Inspection & Ownership

Last InspectionNovember 2024
Inspection FrequencyEvery 12 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour CriticalNot applicable
Structure Number7705557

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.

Nearby Bridges