Overall conditionGood

Set by its lowest-rated component: Deck and Superstructure and Substructure at 8 of 9.

How ratings work
Decksets the rating8/9 · Very Good
Superstructuresets the rating8/9 · Very Good
Substructuresets the rating8/9 · Very Good
Channelnot part of overall7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT236 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 8/9Superstructure 8/9Substructure 8/9

236 ft end to end, longest span 96 ft: about 3 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built201511 years old
Length235.9 ft71.9 m
Daily traffic5,750counted 2018
Last inspectedJune 2021every 48 months

Location

StateNorth Carolina
CountyBrunswick
Location0.5mi.e.of. Jct.us17
CarriesI140w
CrossesTribitary To Morgan Cree
Coordinates34.19696, -78.08204

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length235.9 ft (71.9 m)
Max Span95.8 ft (29.2 m)
Deck Width44.9 ft (13.7 m)
Deck Area985.0 sq m
Main Spans3
Year Built2015

Traffic

Avg Daily Traffic5,750 (2018)
Truck Traffic12%
Lanes On Bridge2

Inspection & Ownership

Last InspectionJune 2021
Inspection FrequencyEvery 48 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical8 — Stable, low risk
Structure Number000000000190235

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.

Nearby Bridges