Structure 59I00650001 · Marshall County, TN

I65 over I65 Rl / SR 11

Carries I65 over I65 Rl / SR 11, 0.03 Mi. N. Giles Co Line.

Overall conditionFair

Set by its lowest-rated component: Substructure at 6 of 9.

How ratings work
Deck7/9 · Good
Superstructure7/9 · Good
Substructuresets the rating6/9 · Satisfactory
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT221 FT OVERALL25 FT0ELEVATION · LENGTHS TO SCALE
Deck 7/9Superstructure 7/9Substructure 6/9 · sets the rating

221 ft end to end, longest span 87 ft: about 3 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a tee-beam bridge.

Built196561 years old
Length221.5 ft67.5 m
Daily traffic24,295counted 2021
Last inspectedSeptember 2024every 24 months

Location

StateTennessee
CountyMarshall
Location0.03 Mi. N. Giles Co Line
CarriesI65
CrossesI65 Rl / SR 11
Coordinates35.30679, -86.88223

Physical Characteristics

MaterialConcrete Continuous
DesignTee Beam
Total Length221.5 ft (67.5 m)
Max Span87.3 ft (26.6 m)
Deck Width40.4 ft (12.3 m)
Deck Area830.2 sq m
Main Spans3
Year Built1965

Traffic

Avg Daily Traffic24,295 (2021)
Truck Traffic7%
Lanes On Bridge2
Lanes Under Bridge2

Inspection & Ownership

Last InspectionSeptember 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceHistorical significance is not determined
Scour CriticalNot applicable
Structure Number59I00650001

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.