Structure 2070 · New Haven County, CT

Interstate-691 EB over Lewis AVE

Carries Interstate-691 EB over Lewis AVE, 0.35 Mi East Of RT 71.

Overall conditionFair

Set by its lowest-rated component: Deck and Superstructure at 6 of 9.

How ratings work
Decksets the rating6/9 · Satisfactory
Superstructuresets the rating6/9 · Satisfactory
Substructure7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT229 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 6/9 · sets the ratingSuperstructure 6/9 · sets the ratingSubstructure 7/9

229 ft end to end, longest span 79 ft: about 3 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built197155 years old
Length229.0 ft69.8 m
Daily traffic31,700counted 2021
Last inspectedNovember 2023every 24 months

Location

StateConnecticut
CountyNew Haven
Location0.35 Mi East Of RT 71
CarriesInterstate-691 EB
CrossesLewis AVE
Coordinates41.54724, -72.80517

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length229.0 ft (69.8 m)
Max Span79.1 ft (24.1 m)
Deck Width53.5 ft (16.3 m)
Deck Area1137.7 sq m
Main Spans3
Year Built1971

Traffic

Avg Daily Traffic31,700 (2021)
Truck Traffic9%
Lanes On Bridge3
Lanes Under Bridge4

Inspection & Ownership

Last InspectionNovember 2023
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour CriticalNot applicable
Structure Number02070

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.