Structure N521 · Apache County, AZ

IRR BIA RTE N26 over Bis Li Ah Wash

Carries IRR BIA RTE N26 over Bis Li Ah Wash, 4 Mi East Of Az HWY 191.

Overall conditionPoor

Set by its lowest-rated component: Superstructure and Substructure at 4 of 9.

How ratings work
Deck5/9 · Fair
Superstructuresets the rating4/9 · Poor
Substructuresets the rating4/9 · Poor
Channelnot part of overall5/9 · Fair
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT182 FT OVERALL25 FT0ELEVATION · LENGTHS TO SCALE
Deck 5/9Superstructure 4/9 · sets the ratingSubstructure 4/9 · sets the rating

182 ft end to end, longest span 35 ft: about 3 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built197650 years old
Length182.1 ft55.5 m
Daily traffic300counted 2023
Last inspectedApril 2023every 24 months

Location

StateArizona
CountyApache
Location4 Mi East Of Az HWY 191
CarriesIRR BIA RTE N26
CrossesBis Li Ah Wash
Coordinates35.92242, -109.56372

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length182.1 ft (55.5 m)
Max Span35.4 ft (10.8 m)
Deck Width13.1 ft (4 m)
Deck Area222 sq m
Main Spans6
Year Built1976

Traffic

Avg Daily Traffic300 (2023)
Truck Traffic5%
Lanes On Bridge1

Inspection & Ownership

Last InspectionApril 2023
Inspection FrequencyEvery 24 months
OwnerBureau of Indian Affairs
Historical SignificanceBridge is not eligible for the National Register
Scour Critical4 — Foundations need monitoring
Structure Number00000000000N521

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.