Overall conditionGood

Set by its lowest-rated component: Deck and Superstructure and Substructure at 7 of 9.

How ratings work
Decksets the rating7/9 · Good
Superstructuresets the rating7/9 · Good
Substructuresets the rating7/9 · Good
Channelnot part of overall6/9 · Satisfactory
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT602 FT OVERALL100 FT0ELEVATION · LENGTHS TO SCALE
Deck 7/9Superstructure 7/9Substructure 7/9

602 ft end to end, longest span 50 ft: about 1.7 football fields. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a box-beam bridge.

Built197848 years old
Length602.4 ft183.6 m
Daily traffic527counted 2022
Last inspectedJune 2024every 24 months

Location

StateArizona
CountyApache
LocationWest Edge Of Rock Point
CarriesIRR BIA RTE N8070
CrossesChinle Wash
Coordinates36.71822, -109.63044

Physical Characteristics

MaterialPrestressed Concrete
DesignBox Beam - Multiple
Total Length602.4 ft (183.6 m)
Max Span50.2 ft (15.3 m)
Deck Width16.1 ft (4.9 m)
Deck Area899.6 sq m
Main Spans12
Year Built1978

Traffic

Avg Daily Traffic527 (2022)
Truck Traffic3%
Lanes On Bridge1

Inspection & Ownership

Last InspectionJune 2024
Inspection FrequencyEvery 24 months
OwnerBureau of Indian Affairs
Historical SignificanceBridge is not eligible for the National Register
Scour Critical8 — Stable, low risk
Structure Number00000000000N252

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.