Structure 90B00118N · Nelson County, KY

Ky 458 over Chaplin River

Carries Ky 458 over Chaplin River, Nelson/washington Line.

Overall conditionFair

Set by its lowest-rated component: Substructure at 6 of 9.

How ratings work
Deck8/9 · Very Good
Superstructure8/9 · Very Good
Substructuresets the rating6/9 · Satisfactory
Channelnot part of overall7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT294 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 8/9Superstructure 8/9Substructure 6/9 · sets the rating

294 ft end to end, longest span 73 ft: about 4 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built201313 years old
Length294.0 ft89.6 m
Daily traffic301counted 2023
Last inspectedFebruary 2024every 48 months

Location

StateKentucky
CountyNelson
LocationNelson/washington Line
CarriesKy 458
CrossesChaplin River
Coordinates37.87056, -85.23083

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignStringer/Multi-beam
Total Length294.0 ft (89.6 m)
Max Span73.2 ft (22.3 m)
Deck Width22.3 ft (6.8 m)
Deck Area609.3 sq m
Main Spans4
Year Built2013

Traffic

Avg Daily Traffic301 (2023)
Lanes On Bridge2

Inspection & Ownership

Last InspectionFebruary 2024
Inspection FrequencyEvery 48 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical8 — Stable, low risk
Structure Number090B00118N

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.