Structure FCLMY-0.1-RVSDE · Larimer County, CO

Lemay Avenue over Cache La Poudre River

Carries Lemay Avenue over Cache La Poudre River, 0.1 Mi N Of Riverside AVE.

Overall conditionFair

Set by its lowest-rated component: Substructure at 5 of 9.

How ratings work
Deck7/9 · Good
Superstructure7/9 · Good
Substructuresets the rating5/9 · Fair
Channelnot part of overall6/9 · Satisfactory
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT266 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 7/9Superstructure 7/9Substructure 5/9 · sets the rating

266 ft end to end, longest span 94 ft: about 4 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built198046 years old
Length266.4 ft81.2 m
Daily traffic22,461counted 2022
Last inspectedApril 2023every 24 months

Location

StateColorado
CountyLarimer
Location0.1 Mi N Of Riverside AVE
CarriesLemay Avenue
CrossesCache La Poudre River
Coordinates40.57967, -105.05739

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignStringer/Multi-beam
Total Length266.4 ft (81.2 m)
Max Span94.2 ft (28.7 m)
Deck Width65.9 ft (20.1 m)
Deck Area1632.1 sq m
Main Spans3
Year Built1980

Traffic

Avg Daily Traffic22,461 (2022)
Truck Traffic12%
Lanes On Bridge4

Inspection & Ownership

Last InspectionApril 2023
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical8 — Stable, low risk
Structure NumberFCLMY-0.1-RVSDE

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.