Structure 20C0171 · Sonoma County, CA

Leveroni RD over Sonoma Creek

Carries Leveroni RD over Sonoma Creek, 0.65 Mi W Jct With SR 12.

Overall conditionGood

Set by its lowest-rated component: Deck and Superstructure and Substructure at 7 of 9.

How ratings work
Decksets the rating7/9 · Good
Superstructuresets the rating7/9 · Good
Substructuresets the rating7/9 · Good
Channelnot part of overall7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT232 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 7/9Superstructure 7/9Substructure 7/9

232 ft end to end, longest span 91 ft: about 3 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a box-beam bridge.

Built196957 years old
Length232.3 ft70.8 m
Daily traffic10,400counted 2015
Last inspectedOctober 2022every 48 months

Location

StateCalifornia
CountySonoma
Location0.65 Mi W Jct With SR 12
CarriesLeveroni RD
CrossesSonoma Creek
Coordinates38.27733, -122.47225

Physical Characteristics

MaterialConcrete Continuous
DesignBox Beam - Multiple
Total Length232.3 ft (70.8 m)
Max Span90.9 ft (27.7 m)
Deck Width40.0 ft (12.2 m)
Deck Area863.8 sq m
Main Spans3
Year Built1969

Traffic

Avg Daily Traffic10,400 (2015)
Truck Traffic2%
Lanes On Bridge2

Inspection & Ownership

Last InspectionOctober 2022
Inspection FrequencyEvery 48 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical5 — Stable for scour
Structure Number20C0171

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.