Structure 3149 · St. Louis County, MO

Mckelvey RD S over Is 270 Rp Is270e To I

Carries Mckelvey RD S over Is 270 Rp Is270e To I, S 729 T 46 N R 5 E.

Overall conditionFair

Set by its lowest-rated component: Deck and Superstructure and Substructure at 6 of 9.

How ratings work
Decksets the rating6/9 · Satisfactory
Superstructuresets the rating6/9 · Satisfactory
Substructuresets the rating6/9 · Satisfactory
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT395 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 6/9Superstructure 6/9Substructure 6/9

395 ft end to end, longest span 119 ft: about 5 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built197947 years old
Length395.0 ft120.4 m
Daily traffic12,192counted 2024
Last inspectedSeptember 2024every 24 months

Location

StateMissouri
CountySt. Louis
LocationS 729 T 46 N R 5 E
CarriesMckelvey RD S
CrossesIs 270 Rp Is270e To I
Coordinates38.74201, -90.44107

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length395.0 ft (120.4 m)
Max Span119.1 ft (36.3 m)
Deck Width82.3 ft (25.1 m)
Deck Area3022.0 sq m
Main Spans4
Year Built1979

Traffic

Avg Daily Traffic12,192 (2024)
Truck Traffic5%
Lanes On Bridge4
Lanes Under Bridge12

Inspection & Ownership

Last InspectionSeptember 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour CriticalNot applicable
Structure Number3149

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.