Structure 85330000000000 · King County, WA

N Queen Anne DR over Ravine

Carries N Queen Anne DR over Ravine, Queen Anne DR & 3rd AVE N.

Overall conditionFair

Set by its lowest-rated component: Superstructure at 5 of 9.

How ratings work
Deck6/9 · Satisfactory
Superstructuresets the rating5/9 · Fair
Substructure7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT327 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 6/9Superstructure 5/9 · sets the ratingSubstructure 7/9

327 ft end to end: about 5 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a deck arch.

Built193591 years old
Length327.1 ft99.7 m
Daily traffic—reported figure implausible
Last inspectedApril 2024every 24 months

Location

StateWashington
CountyKing
LocationQueen Anne DR & 3rd AVE N
CarriesN Queen Anne DR
CrossesRavine
Coordinates47.64222, -122.35250

Physical Characteristics

MaterialSteel Continuous
DesignArch - Deck
Total Length327.1 ft (99.7 m)
Max Span140.1 ft (42.7 m)
Deck Width44.9 ft (13.7 m)
Deck Area1365.9 sq m
Main Spans1
Year Built1935

Traffic

Avg Daily Traffic125,000 (2020)
That is about 62,500 vehicles per lane per day — beyond what any U.S. road carries (the busiest freeways run about 25,000–30,000). It is almost certainly a data-entry error in the National Bridge Inventory, so we leave this bridge out of traffic rankings.
Truck Traffic5%
Lanes On Bridge2

Inspection & Ownership

Last InspectionApril 2024
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is on the National Register of Historic Places
Scour CriticalNot applicable
Structure Number085330000000000

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.