Structure 61503000001551 · Douglas County, OR

No Data Entered over Lemolo #1 Canal

Carries No Data Entered over Lemolo #1 Canal, Near Lemolo #1 Forebay.

Overall conditionFair

Set by its lowest-rated component: Deck and Superstructure and Substructure at 6 of 9.

How ratings work
Decksets the rating6/9 · Satisfactory
Superstructuresets the rating6/9 · Satisfactory
Substructuresets the rating6/9 · Satisfactory
Channelnot part of overall8/9 · Very Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
CAR · 15 FT40 FT OVERALL25 FT0ELEVATION · LENGTHS TO SCALE
Deck 6/9Superstructure 6/9Substructure 6/9

40 ft end to end. Lengths and the car on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built196066 years old
Length40.0 ft12.2 m
Daily traffic501 lanes
Last inspectedJune 2023every 24 months

Location

StateOregon
CountyDouglas
LocationNear Lemolo #1 Forebay
CarriesNo Data Entered
CrossesLemolo #1 Canal
Coordinates43.35851, -122.22118

Physical Characteristics

MaterialWood or Timber
DesignStringer/Multi-beam
Total Length40.0 ft (12.2 m)
Max Span39.0 ft (11.9 m)
Deck Width15.7 ft (4.8 m)
Deck Area58.6 sq m
Main Spans1
Year Built1960

Traffic

Avg Daily Traffic50
Lanes On Bridge1

Inspection & Ownership

Last InspectionJune 2023
Inspection FrequencyEvery 24 months
OwnerU.S. Forest Service
Historical SignificanceHistorical significance is not determined
Scour Critical6 — Scour calculated, stable
Structure Number061503000001551

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.

Nearby Bridges