Off Pr 128 Km 31.3 over Unnamed Creek
Fair Condition13 years old500 vehicles/day
Location
| State | Puerto Rico |
| County | Maricao Municipio |
| Location | 11.18 Km S.e. Of Maricao |
| Carries | Off Pr 128 Km 31.3 |
| Crosses | Unnamed Creek |
| Coordinates | 18.17511, -66.88205 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 7 (Good) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 4 — Foundations need monitoring |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 35.1 ft (10.7 m) |
| Max Span | 32.2 ft (9.8 m) |
| Deck Width | 20.3 ft (6.2 m) |
| Deck Area | 66.3 sq m |
| Main Spans | 1 |
| Year Built | 2013 |
Traffic
| Avg Daily Traffic | 500 (2017) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 224 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 029911 |