Structure 45139 · York County, PA
Carries Pa Turnpike (i-76) over Susq R Amt Sr0230.nsrr, Fairview Twp.
Set by its lowest-rated component: Deck and Superstructure and Substructure at 7 of 9.
How ratings work5,910 ft end to end, longest span 150 ft: about 16 football fields, or 1.1 miles. Lengths are drawn to scale; at this length a semi-truck would be a speck. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a segmental box-girder bridge.
| State | Pennsylvania |
| County | York |
| Location | Fairview Twp |
| Carries | Pa Turnpike (i-76) |
| Crosses | Susq R Amt Sr0230.nsrr |
| Coordinates | 40.20549, -76.80415 |
| Material | Concrete Continuous |
| Design | Segmental Box Girder |
| Total Length | 5910.1 ft (1801.4 m) |
| Max Span | 149.9 ft (45.7 m) |
| Deck Width | 57.1 ft (17.4 m) |
| Deck Area | 31344.4 sq m |
| Main Spans | 40 |
| Year Built | 2007 |
| Avg Daily Traffic | 16,200 (2008) |
| Truck Traffic | 21% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 2 |
| Last Inspection | April 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Toll Authority |
| Historical Significance | Historical significance is not determined |
| Scour Critical | 8 — Stable, low risk |
| Structure Number | 000000000045139 |
Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."
A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.