Pr 109 over Corcovada Creek
Fair Condition85 years old3,600 vehicles/day
Location
| State | Puerto Rico |
| County | Anasco Municipio |
| Location | 12 Km East Of A%asco |
| Carries | Pr 109 |
| Crosses | Corcovada Creek |
| Coordinates | 18.27990, -67.06234 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Slab |
| Total Length | 47.9 ft (14.6 m) |
| Max Span | 19.7 ft (6 m) |
| Deck Width | 23.0 ft (7 m) |
| Deck Area | 102.2 sq m |
| Main Spans | 2 |
| Year Built | 1941 |
Traffic
| Avg Daily Traffic | 3,600 (2017) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | November 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 002261 |