Pr 135 over Limani (blanco) River
Fair Condition30 years old1,000 vehicles/day
Location
| State | Puerto Rico |
| County | Adjuntas Municipio |
| Location | 8 Km N W Of Adjuntas |
| Carries | Pr 135 |
| Crosses | Limani (blanco) River |
| Coordinates | 18.19886, -66.79722 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 5 (Fair) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 200.5 ft (61.1 m) |
| Max Span | 98.4 ft (30 m) |
| Deck Width | 40.0 ft (12.2 m) |
| Deck Area | 745.4 sq m |
| Main Spans | 3 |
| Year Built | 1996 |
Traffic
| Avg Daily Traffic | 1,000 (2017) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | November 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 024191 |