Pr 2 Eastbound over Waterway
Fair Condition58 years old16,650 vehicles/day
Location
| State | Puerto Rico |
| County | Guayanilla Municipio |
| Location | 3.5 Km S E Of Guayanilla |
| Carries | Pr 2 Eastbound |
| Crosses | Waterway |
| Coordinates | 18.01312, -66.76310 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 5 (Fair) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 3 — Scour critical |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Slab |
| Total Length | 78.7 ft (24 m) |
| Max Span | 28.5 ft (8.7 m) |
| Deck Width | 40.7 ft (12.4 m) |
| Deck Area | 297.6 sq m |
| Main Spans | 3 |
| Year Built | 1968 |
Traffic
| Avg Daily Traffic | 16,650 (2017) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | December 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 009442 |