Structure 61405000001020 · Umatilla County, OR

Road over North Fork John Day

Carries Road over North Fork John Day, HWY 395 & Road 3963..

Overall conditionFair

Set by its lowest-rated component: Superstructure and Substructure at 5 of 9.

How ratings work
Deck7/9 · Good
Superstructuresets the rating5/9 · Fair
Substructuresets the rating5/9 · Fair
Channelnot part of overall7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
CAR · 15 FT75 FT OVERALL25 FT0ELEVATION · LENGTHS TO SCALE
Deck 7/9Superstructure 5/9 · sets the ratingSubstructure 5/9 · sets the rating

75 ft end to end. Lengths and the car on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built1956rebuilt 1989
Length75.1 ft22.9 m
Daily traffic10counted 2009
Last inspectedAugust 2023every 24 months

Location

StateOregon
CountyUmatilla
LocationHWY 395 & Road 3963.
CarriesRoad
CrossesNorth Fork John Day
Coordinates45.00170, -118.98920

Physical Characteristics

MaterialWood or Timber
DesignStringer/Multi-beam
Total Length75.1 ft (22.9 m)
Max Span73.8 ft (22.5 m)
Deck Width16.1 ft (4.9 m)
Deck Area112.2 sq m
Main Spans1
Year Built1956 (reconstructed 1989)

Traffic

Avg Daily Traffic10 (2009)
Lanes On Bridge1

Inspection & Ownership

Last InspectionAugust 2023
Inspection FrequencyEvery 24 months
OwnerU.S. Forest Service
Historical SignificanceHistorical significance is not determined
Scour Critical4 — Foundations need monitoring
Structure Number061405000001020

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.