Structure 61405000001039 · Umatilla County, OR

Road over North Fork John Day

Carries Road over North Fork John Day, Int RD 55 And 5505.

Overall conditionFair

Set by its lowest-rated component: Substructure at 6 of 9.

How ratings work
Deck7/9 · Good
Superstructure7/9 · Good
Substructuresets the rating6/9 · Satisfactory
Channelnot part of overall5/9 · Fair
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT153 FT OVERALL25 FT0ELEVATION · LENGTHS TO SCALE
Deck 7/9Superstructure 7/9Substructure 6/9 · sets the rating

153 ft end to end, longest span 64 ft: about 2 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a rigid-frame bridge.

Built195967 years old
Length152.9 ft46.6 m
Daily traffic17counted 1989
Last inspectedAugust 2023every 24 months

Location

StateOregon
CountyUmatilla
LocationInt RD 55 And 5505
CarriesRoad
CrossesNorth Fork John Day
Coordinates45.01611, -118.85073

Physical Characteristics

MaterialConcrete Continuous
DesignFrame
Total Length152.9 ft (46.6 m)
Max Span63.6 ft (19.4 m)
Deck Width16.4 ft (5 m)
Deck Area233 sq m
Main Spans4
Year Built1959

Traffic

Avg Daily Traffic17 (1989)
Lanes On Bridge1

Inspection & Ownership

Last InspectionAugust 2023
Inspection FrequencyEvery 24 months
OwnerU.S. Forest Service
Historical SignificanceHistorical significance is not determined
Scour Critical4 — Foundations need monitoring
Structure Number061405000001039

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.