Structure 2099 · Pemiscot County, MO

Rp Is55s To Is155s over Is 155

Carries Rp Is55s To Is155s over Is 155, S 10 T 18 N R 12 E.

Overall conditionGood

Set by its lowest-rated component: Deck and Superstructure and Substructure at 7 of 9.

How ratings work
Decksets the rating7/9 · Good
Superstructuresets the rating7/9 · Good
Substructuresets the rating7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT268 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 7/9Superstructure 7/9Substructure 7/9

268 ft end to end, longest span 114 ft: about 4 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built1974rebuilt 1984
Length268.0 ft81.7 m
Daily traffic1,847counted 2024
Last inspectedNovember 2024every 24 months

Location

StateMissouri
CountyPemiscot
LocationS 10 T 18 N R 12 E
CarriesRp Is55s To Is155s
CrossesIs 155
Coordinates36.21517, -89.74642

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length268.0 ft (81.7 m)
Max Span113.8 ft (34.7 m)
Deck Width40.7 ft (12.4 m)
Deck Area1013.1 sq m
Main Spans3
Year Built1974 (reconstructed 1984)

Traffic

Avg Daily Traffic1,847 (2024)
Truck Traffic40%
Lanes On Bridge1
Lanes Under Bridge2

Inspection & Ownership

Last InspectionNovember 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour CriticalNot applicable
Structure Number2099

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.