Structure 183540000000000 · Tulsa County, OK

S.h. 11 over Bird Creek

Carries S.h. 11 over Bird Creek, 2 Mi S Washington Co.

Overall conditionFair

Set by its lowest-rated component: Deck and Superstructure and Substructure at 5 of 9.

How ratings work
Decksets the rating5/9 · Fair
Superstructuresets the rating5/9 · Fair
Substructuresets the rating5/9 · Fair
Channelnot part of overall6/9 · Satisfactory
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT352 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 5/9Superstructure 5/9Substructure 5/9

352 ft end to end, longest span 100 ft: about 5 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built197254 years old
Length352.0 ft107.3 m
Daily traffic2,500counted 2022
Last inspectedSeptember 2024every 24 months

Location

StateOklahoma
CountyTulsa
Location2 Mi S Washington Co
CarriesS.h. 11
CrossesBird Creek
Coordinates36.39468, -95.99151

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length352.0 ft (107.3 m)
Max Span100.1 ft (30.5 m)
Deck Width34.1 ft (10.4 m)
Deck Area1115.9 sq m
Main Spans4
Year Built1972

Traffic

Avg Daily Traffic2,500 (2022)
Truck Traffic16%
Lanes On Bridge2

Inspection & Ownership

Last InspectionSeptember 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical8 — Stable, low risk
Structure Number183540000000000

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.