Structure 37 0353F · Santa Clara County, CA
Carries S680-s101 Connectr over I 280 I 680 US 101 Story, 04-scl-680-m0.01-sjs.
6,537 ft end to end, longest span 169 ft: about 18 football fields, or 1.2 miles. Lengths are drawn to scale; at this length a semi-truck would be a speck. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a box-beam bridge.
| State | California |
| County | Santa Clara |
| Location | 04-scl-680-m0.01-sjs |
| Carries | S680-s101 Connectr |
| Crosses | I 280 I 680 US 101 Story |
| Coordinates | 37.33736, -121.85110 |
| Material | Concrete Continuous |
| Design | Box Beam - Multiple |
| Total Length | 6537.1 ft (1992.5 m) |
| Max Span | 169.0 ft (51.5 m) |
| Deck Width | 42.0 ft (12.8 m) |
| Deck Area | 25,504 sq m |
| Main Spans | 50 |
| Year Built | 1982 |
| Avg Daily Traffic | 36,000 (2009) |
| Truck Traffic | 4% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 17 |
| Last Inspection | July 2023 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Scour Critical | Not applicable |
| Structure Number | 37 0353F |
Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."
A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.