Structure 84201000000000 · Lewis County, WA

Shorey RD over Newaukum River

Carries Shorey RD over Newaukum River, 0.83 SE Jct SR 6.

Overall conditionFair

Set by its lowest-rated component: Deck and Substructure at 6 of 9.

How ratings work
Decksets the rating6/9 · Satisfactory
Superstructure7/9 · Good
Substructuresets the rating6/9 · Satisfactory
Channelnot part of overall6/9 · Satisfactory
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT380 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 6/9 · sets the ratingSuperstructure 7/9Substructure 6/9 · sets the rating

380 ft end to end, longest span 80 ft: about 5 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a box-beam bridge.

Built196066 years old
Length379.9 ft115.8 m
Daily traffic2,826counted 2021
Last inspectedFebruary 2024every 24 months

Location

StateWashington
CountyLewis
Location0.83 SE Jct SR 6
CarriesShorey RD
CrossesNewaukum River
Coordinates46.64991, -122.98098

Physical Characteristics

MaterialConcrete Continuous
DesignBox Beam - Multiple
Total Length379.9 ft (115.8 m)
Max Span80.1 ft (24.4 m)
Deck Width28.5 ft (8.7 m)
Deck Area1007.5 sq m
Main Spans3
Year Built1960

Traffic

Avg Daily Traffic2,826 (2021)
Truck Traffic14%
Lanes On Bridge2

Inspection & Ownership

Last InspectionFebruary 2024
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour CriticalUnknown
Structure Number084201000000000

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.