Structure 80845000000000 · Snohomish County, WA

Smokey Point BLVD over South Slough

Carries Smokey Point BLVD over South Slough, 0.3 S Jct SR 530.

Overall conditionFair

Set by its lowest-rated component: Superstructure and Substructure at 5 of 9.

How ratings work
Deck7/9 · Good
Superstructuresets the rating5/9 · Fair
Substructuresets the rating5/9 · Fair
Channelnot part of overall7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT184 FT OVERALL25 FT0ELEVATION · LENGTHS TO SCALE
Deck 7/9Superstructure 5/9 · sets the ratingSubstructure 5/9 · sets the rating

184 ft end to end, longest span 80 ft: about 3 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a deck arch.

Built1918rebuilt 2007
Length183.7 ft56 m
Daily traffic5,889counted 2024
Last inspectedSeptember 2024every 24 months

Location

StateWashington
CountySnohomish
Location0.3 S Jct SR 530
CarriesSmokey Point BLVD
CrossesSouth Slough
Coordinates48.18406, -122.19374

Physical Characteristics

MaterialConcrete
DesignArch - Deck
Total Length183.7 ft (56 m)
Max Span80.1 ft (24.4 m)
Deck Width30.8 ft (9.4 m)
Deck Area526.4 sq m
Main Spans2
Year Built1918 (reconstructed 2007)

Traffic

Avg Daily Traffic5,889 (2024)
Truck Traffic17%
Lanes On Bridge2

Inspection & Ownership

Last InspectionSeptember 2024
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical8 — Stable, low risk
Structure Number080845000000000

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.